YEAR

June 2020 – January 2021

PROJECT

Laingholm School and Fruitvale School

Civil Alliance were hired mid project to assist with a complex assignment. Our skilled crews had to undertake a wide range of civil works in a short period of time.

Installation of concrete pipes, manhole connections including subsoils and water pipes

Excavation for foundations, back filling behind retaining walls and

Reinstatement of school grounds, topsoil and grass

Trench Excavation for utility installation

Landscaping preparation

Kerb and channel preparation and construction

Pavement preparation and asphalting